strengthening of existing 66kv transmission line from existing 220/66kv anchepalya sub station to 66/11kv yadiyuru substation,strengthening of existing 66kv dc line with coyote conductor to hpc from 220kv yachenahalli sub-station to diversion tower of shravanabelagola dc line &reconductoring of existing 66kv coyote conductor by htls conductor from 220 kv yachenahally sub-station to 66 kv c.r. patna station